Virtual informational models of buildings and installations developed by specialists of our company (3D, 4D, 5D) contain information of every necessary level of detail.
Main problems solved with the help of BIM technologies during design:
• Control over interrelation of solutions from different project chapters;
• Calculation of amount of materials, equipment, parts used in the projects;
• Budgetary estimations and high precision cost sheets;
• Timely and correct update of the project;
• Obtaining and accumulation of information for the client’s further needs.
Application of BIM technologies provides the following advantages to the Client/Investor:
• Decrease of design terms;
• Decrease of number of reworking and mistakes during design and construction;
• Precise financial forecast of project fulfillment;
• Optimization of construction cost;
• Improvement of operational quality and decrease in operational costs with the help of obtaining detailed information of the facility, accumulated during the entire period of design and construction.
Kurumoch Airport Terminal
08.01.2015
Address:
Samara
Total area: 41 000 sq.m
Client: Airports of Regions
Location: Volga
Spectrum Services: Design / Project management / Quality control/construction supervision / Building information modeling (BIM) / Construction management / Engineering-construction design / Cost management / General designer / Technical Zakazchik
Total area: 41 000 sq.m
Client: Airports of Regions
Location: Volga
Spectrum Services: Design / Project management / Quality control/construction supervision / Building information modeling (BIM) / Construction management / Engineering-construction design / Cost management / General designer / Technical Zakazchik
New terminal of International Airport of Perm
19.08.2014
Address:
Perm
Total area: 28 000 sq.m
Location: Volga
Spectrum Services: Design / Architectural design / Building information modeling (BIM) / Engineering-construction design / General designer
Total area: 28 000 sq.m
Location: Volga
Spectrum Services: Design / Architectural design / Building information modeling (BIM) / Engineering-construction design / General designer
Globus Hypermarkets
10.04.2014
Address:
Smolensk, Moscow region – Korolev, Krasnogorsk and Noginsky districts, Ivanisovo village, Tver, Electrostal
Total area: 37 500 – 100 000 sq.m
Location: Moscow
Spectrum Services: Design / Architectural design / Building information modeling (BIM) / Engineering-construction design / General designer
Total area: 37 500 – 100 000 sq.m
Location: Moscow
Spectrum Services: Design / Architectural design / Building information modeling (BIM) / Engineering-construction design / General designer
Super-regional Mall in Kaliningrad
19.02.2014
Address:
Guryevsky district, Kaliningrad region
Total area: 83 730 sq.m
Client: Gamma Invest Group
Spectrum Services: Building information modeling (BIM) / Design / Engineering-construction design / General designer
Total area: 83 730 sq.m
Client: Gamma Invest Group
Spectrum Services: Building information modeling (BIM) / Design / Engineering-construction design / General designer